To:       RIAC
From:     Tim Robinson
Date: 7/17/01
Subject: Status report UM mile 306.9 to 312.5
ITCS Memo # 1778

The pilot channel at UM mile 312.5 has been buoyed and N/B test tows have begun. Early reports indicate the pilot channel should be able to accommodate full size tows both N/B and S/B. If all continues to go well, the river closure for UM mile 305 to 312 should be canceled tonight and traffic can resume as normal.

RIBB Homepage  Previous Page


Last updated: Saturday, 21-Jun-2003 21:16:26 MDT
© 2001 Virtual Data Systesm.