To:       RIAC
From:     RIAC Chairman
Date: 3/26/08
Subject: Update on Lock #25
ITCS Memo # 2640

All
Today around 1430 Lock #25 experienced a problem with the gusset pin backing out due to the lower gates not being plumb. At this time the lock is shut down until the engineers can determine if safe locking operations can resume. If they are unable to resume operations I will meet with Andy Schimpf to determine if the towing industry can assist in any way to help expedite mobilization of the crane or in any manner to begin the repairs.


Ed Henleben
Senior Operations Manager
Ingram Barge Company
#1 Davis Street Ferry Road
East Carondelet, IL 62240
618-286-1517 Office
314-304-2557 Cell
615-695-3704 Fax
Ed.Henleben@ingrambarge.com


RIBB Homepage  Previous Page


Last updated: Wednesday, 26-Mar-2008 16:02:29 MDT
© 2001 Virtual Data Systesm.