Lock Weather Report

Lock: Lock 17

Weather Conditions as of: -0/4-/2005 8: 1 pm
Air Temp Water Temp Dam Condition Weather Precipitation (inches)
66 62 OUT Cloudy 0

Pool Elevation & Changes

Upper Elevation Change Lower Elevation Change
11.3 ft. -0.49 ft. 10.99 ft. -0.48 ft.

Comments:

Lock 17 will be closed to all navigation from 0800 to 1300 on 23
April 2005 to replace the bonnet on the #1 miter gate. Towboat
operators are requested NOT to tie up on the guidewalls.
****************************************************************
**************
Extensive damage occurred to Miter Gate #2 on 27 March 2004.
Towboats are advised to stay off #2 gate. Any contact with the
gate may also cause damage to a barge.

Return to Upper Mississippi River      Check Lock Queue

Disclaimer:
The locking information presented above is pulled from the Corps of Engineers Omni Report every 30 minutes. For "Real Time" information the Omni reports can be found at http://155.76.240.28/mvrimi/omni/webrpts. Lock delay estimations are generated by the RIBB website and NOT the Corps of Engineers or the Omni Report itself.

Any questions or comments about this report can be e-mailed to webmaster@ribb.com.