| Lock Weather Report |
|---|
| Lock: Lock 25 |
| Weather Conditions as of: -0/4-/2005 8: 1 pm |
| Air Temp | Water Temp | Dam Condition | Weather | Precipitation (inches) |
|---|---|---|---|---|
| 61 | 62 | OUT | Partly Cloudy | 0 |
| Pool Elevation & Changes |
|---|
| Upper Elevation | Change | Lower Elevation | Change |
|---|---|---|---|
| 430.5 ft. | -0.25 ft. | 429.58 ft. | -0.48 ft. |
| Comments: AS OF 19 MARCH 2003, CREW CHANGES ARE ALLOWED PROVIDED LOCK IS NOTIFIED BY FAX ON COMPANY LETTERHEAD IN ADVANCE. FAX MUST IDENTIFY BY NAME ANYONE TO BOARD THE VESSEL, DRIVER'S NAME AND VEHICLE IDENTIFICATION. IDENTIFICATION BY INDIVIDUAL MUST MATCH FAX INFORMATION. NO EXCEPTIONS TO THIS PERMITTED! DUE TO SECURITY WE WILL NOT ACCEPT PACKAGES THROUGH MAIL OR FEDEX. ALL NORTHBOUND VESSELS WITH BARGES ASSEMBLED BY HARBOR CREWS WILL ENSURE THAT A PROPER BREAK COUPLING IS IN PLACE PRIOR TO START OF LOCKAGE AT THIS LOCATION. NO COUPLING WILL BE STRIPPED AND RELAID DURING THE LOCKAGE PROCESS. THE FIRST SOUTHBOUND TOW TO LOCK AFTER ANY NORTHBOUND TOW WILL UTILIZE THE L-DIKE AS THEIR WAITING AREA. REFUSAL TO USE THE L-DIKE WILL RESULT IN LOSS OF LOCK TURN. WARNING!!!!!!!!WARNING!!!!!!!!!!!!WARNING!!!!!!!!!!!!! ALL TOWS NORTHBOUND AND SOUTHBOUND NEED TO NOT RUB OR LAND ON THE GUIDECELL ON THE LOWER END OF THE LOWER GUIDEWALL AS IT HAS BEEN DAMAGED AND COULD BE DAMAGED FURTHER AND ALSO CAUSE DAMAGE TO A BARGE THAT WOULD LAND ON IT. WARNING !!!!!!!!!!!!WARNING!!!!!!!!!!!WARNING!!!!!!!!!! |
Return to Upper Mississippi River      Check Lock Queue |
| Disclaimer: The locking information presented above is pulled from the Corps of Engineers Omni Report every 30 minutes. For "Real Time" information the Omni reports can be found at http://155.76.240.28/mvrimi/omni/webrpts. Lock delay estimations are generated by the RIBB website and NOT the Corps of Engineers or the Omni Report itself. Any questions or comments about this report can be e-mailed to webmaster@ribb.com. |
![]() © 2001 Virtual Data Systems. |